
Industrial installation contractor · Saudi Arabia
Mechanical installation.
Controlled to handover.
ECC executes machinery and production-line installation, precision alignment and 3D verification, structural steel, industrial civil works, MEP, and maintenance packages for factories and industrial facilities.
Integrated execution
Separate disciplines.
Controlled interfaces.
Industrial packages fail at interfaces: foundation to baseplate, equipment to equipment, structure to services, installation to acceptance. ECC organizes these handoffs within one execution sequence.
Mechanical installation
Setting, assembly, restraint, and mechanical completion.
3D measurement & alignment
Project datums, measured deviation, adjustment, and as-left records.
Steel & industrial civil
Structures, access, foundations, slabs, and equipment interfaces.
MEP & utilities
Electrical, HVAC, fire, plumbing, ventilation, and utility coordination.

Representative visualization of ECC precision installation capability.
Precision machinery installation
Position is adjusted. Final geometry is verified.
ECC links mechanical setting with approved datums, systematic adjustment, equipment-interface checks, and documented as-left condition. Laser Tracker or other measurement methods are selected only when the project geometry and tolerances justify them.
Selected project experience
Disclosed scopes. Clear attribution.
A selected view of ECC’s direct Saudi experience and the separately identified industrial track record of parent company EGYPT-GERMAN Co.
View all project experience →Mechanical Installations of Pump Room
Tabuk Acciona Project
Manufacturing & Supply of Sleeve Couplings
New Satellite Plant Water Transmission System — Phase 2
Factory Efficiency Upgrade — Rod-Line Mechanical Equipment & Structural Works
United Metal Company (Al-Motaheda for Metals)
Production & Roll-Forming Line — Installation, Testing & Commissioning
Hydro Mechanical Company
Magi Production Line — Civil, Steel & Electro-Mechanical Works
Nestlé Egypt
Raw Material Warehouse — Civil, Racking & MEP Systems
Lacto Misr (LACTO Egypt)
Cold Storage Warehouse — Renewal & MEP Systems
Farm Frites
Grain Silos — Civil, Steel & Electro-Mechanical Works
General Co. for Silos & Storage
Mechanical execution scopes
Installation and plant-work packages with defined completion points
Production Line Installation
Sequenced setting and interface alignment across connected equipment.
Industrial Machinery Installation
Rigging coordination, setting, leveling, restraint, and completion.
Mechanical Equipment Installation
Positioning and assembly of packaged and static equipment.
Conveyors & Material Handling
Structural, mechanical, drive, and transfer-point installation.
Industrial Maintenance
Planned corrective work, replacements, and plant modifications.
Shutdown Works
Time-bound mechanical execution within an approved outage plan.
Plant Modification
Brownfield changes coordinated around live interfaces and access.
Mechanical Assembly
Field assembly, fit-up, fastening, and interface completion.
Equipment Relocation
Controlled dismantling, movement, re-setting, and re-verification.
Industrial Piping
Fabrication, installation, supports, testing, and reinstatement.





Structural and enabling works
Steel, access, foundations, and equipment interfaces
Fabrication and erection of structural steel, platforms, pipe racks, stairs, handrails, equipment frames, and site modifications—coordinated with foundations, anchors, access, and installed equipment.
Review steel & civil scopes

Industrial civil works
Foundations, concrete, levels, and equipment interfaces
Review civil execution scope →
MEP and industrial utilities
HVAC, piping, electrical, fire protection, and plant services
Review MEP execution scope →Maintenance and brownfield work
Field intervention around existing plant conditions.
Planned maintenance, equipment intervention, replacement work, testing, and modifications coordinated around access, isolation, sequence, and return-to-service requirements.
Review maintenance scope →




Turnkey industrial execution
From site mobilization
to final handover
Engineering Review
Planning & Methodology
Mobilization
Mechanical / Civil / Steel Execution
Precision Adjustment
Inspection & Verification
Quality Documentation
Final Handover

Industries served
Industrial sectors. One execution mindset.
ECC in the field
Real people. Real sites. Real execution.








For procurement, EPC, and plant teams
Built around subcontract scope control.
ECC can review focused work packages or coordinated multidiscipline scopes. The commercial path starts with the same information your project team already controls: scope, drawings, BOQ, specifications, site, and required dates.
Typical review sequence
Initial inquiry
Need to confirm fit before issuing an RFQ?
Use this short form for an early scope discussion. If the package is ready, go directly to the RFQ page and attach the tender documents.
Go to Request for QuotationDrawings · BOQ · Specifications · Required dates
